Malaysia Managment and Marine Engineering Services

DRAWINGS & DOCUMENTS CONTROL

DRAWINGS & DOCUMENTS CONTROL

 

All drawings and documents issued/received to/from any third party for means of quotation or approval by the clients shall be endorsed, recorded and maintained.

 

For approval engineering design drawing and document to customer shall be stamped with the word “FOR APPROVAL”.

 

All drawings and documents generated from approved status, for construction, fabrication or erection used shall be stamped “FOR CONSTRUCTION”.

 

New revision to the existing design drawing and document shall be identified “SUPERSEDED” in red to the existing original copy and kept in the superseded file for future reference.

 

As built drawings shall be stamp “AS BUILT” by the Design Engineer and compile by QC Engineer/Inspector in the Manufacturer Data Report.